烟道阀门的安装
编辑:淄博金冠厨房设备有限公司   时间:2017-11-28

一、不锈钢排烟罩风管运用过程有哪些?

  First, what are the steps of stainless steel duct?

  1、不锈钢风管施工装置简略。烟道止逆阀的装置不受工期约束,毛坯烟道和装饰后的烟道都可以便当的装置。底版的规划确保了烟道孔洞的规范,停止逆阀的装置供给了便当的条件。

  1, stainless steel duct construction, installation is simple. The installation of the flue check valve is not limited by the time limit, and the rough flue and the decorated flue can be conveniently installed. Master the design to ensure that the flue hole specification, so inverse valve installation provides convenient conditions.

  2、用户拆装便当。可在短时间内完结拆装,便于检修、替换等操作。

  2, users easy disassembly. Can be completed in a short time, disassembly, easy to overhaul, replacement and other operations.

  3、不设滤网、不设油盒。没有二次污染,削减清洗次数。

  3, no filter screen, no oil box. No two pollution, reduce the number of cleaning.

  4、排气晓畅、止烟密实。排烟罩绝无走漏现象。

  4, exhaust unobstructed, smoke tight. No leakage.

  5、外型美观大方.

  5, beautiful appearance

  二、通风管道装置的注意事项:

  Two, Ji'nan ventilation pipe installation matters needing attention:

  1、处理各种通风管道相碰及和谐的准则,一般为:“小管让大管,有压让无压”。例如,自来水管与风管相撞,则应当自来水管拐弯。冷、热水管与下水管相碰,则应改变冷、热水管道。

济南酒店排烟罩生产厂家

  1, solve all kinds of ventilation pipe collide and coordination principle, generally: "let the pressure get tubular bassoon, no pressure". For example, when the water pipe is in collision with the air pipe, the water pipe should be turned. The cold and hot water pipes and water pipes together, should change the cold and hot water pipe.

  2、施工前应设备总管的工程师,将各工种的管线,单线画在一张平面图上。每种管道用一种彩色笔。在各交点处归纳其标高,看是否有矛盾之处,及时发现,将问题处理在装置之前。

  2. Before the construction, the engineer of the equipment head shall draw the line of each kind of work in a single plan. Each pipe uses a color pen. At the intersection of each of its elevation, to see if there are inconsistencies, timely discovery, the problem before the installation.

  3、关于比较复杂的民用修建,在规划阶段,各工种(暖通、给水排水,供电照明与修建专业)首先应洽谈好空间分隔,定出每种管道的标高范围。一般情况下排烟罩不得越出给自己规则的界限。遇有单个管段要越界时应与其他工程洽谈。

  3, for more complex civil construction, in the design stage, all types of work (HVAC, water supply, drainage, power supply lighting and building professional), first of all, should negotiate space separation, determine the elevation of each pipe range. The general case not set himself beyond the boundaries. In case a paragraph is crossed, consult with other projects.