排烟罩的安装和选择很重要
编辑:淄博金冠厨房设备有限公司   时间:2017-11-02

排烟罩通风管道只要在装置前做好预备才能确保后期装置顺畅,也削减后期通风管道使用过程中问题的发生。

The ventilation ducts are only ready before installation to ensure the smooth installation of the later stage and to reduce the occurrence of problems in the use of later ventilation ducts.

1、一般除尘体系通风管道装置,需在厂房内与风管有关的工艺设备装置结束,设备的接收或吸、排尘罩位置已定的条件下进行。

1, general dust removal system ventilation pipe installation, need to be in the workshop with the wind pipe related process equipment installation, equipment take over or suction and dust discharge hood position has been set under the conditions.

2、依据所需装置通风管道的场所结构及环境,进行通风管道设计,确保通风管道的实用性。

2. Ventilation piping design shall be carried out according to the site, structure and environment required for installation of the ventilation pipe to ensure the practicability of the ventilation duct.

3、排烟罩要与土建施工密切配合,应预图的装置孔洞,预埋的支架构件均已无缺,并经查看契合设计要求。

3, to work closely with the civil construction, should be pre installed holes, the pre embedded support components are intact, and checked to meet the design requirements.

4、一般送排风体系和空调体系的通风管道装置,需在建筑物的屋面做完,装置部位的障碍物已涪理洁净的条件下进行。

4, general ventilation pipe ventilation system and air conditioning system installation, should be done in the roof of a building, the obstacle of the installation part has disposal of clean conditions.

5,通风及空调体系管路组成的各种通风管道、部件、配件均已加工结束,并经质量查看合格。

5, ventilation and air conditioning systems composed of a variety of ductwork, parts and fittings have been processed, and the quality inspection qualified.

6、排烟罩施工预备工作已做好,如施工东西、吊装机械设备、必要的脚手架或升降装置渠道已齐备施工用科已能满足要求。

6, construction preparation work has been done, such as construction tools, hoisting machinery and equipment, necessary scaffolding or lifting installation platform has been completed, construction section has been able to meet the requirements.